Production Dashboard
A single view of jobs, waste, performance and production.
Jobs today
8
6 running / completeWaste today
4.7%
Target ≤ 5%Avg. speed
142
m/min
Setup time
38m
average
Active jobs
| Job | Press | Status |
|---|---|---|
| PM-1048 | FA-4 Classic | Running |
| PM-1049 | Digital 01 | Queued |
| PM-1050 | FA-4 Classic | Setup |
Attention
PM-1048 waste is 1.2% above estimate.
FA-4 setup time is 9 min above target.
2 repeat jobs have previous successful settings available.
Jobs
Quote → plan → set up → produce → record → improve.
| Job | Customer | Process | Length | Status |
|---|---|---|---|---|
| PM-1048 | Demo Packaging | Flexo | 50,000 m | Running |
| PM-1049 | North Labels | Digital | 12,500 m | Queued |
| PM-1050 | Demo Packaging | Flexo | 30,000 m | Setup |
Job Costing
Quick prototype estimator. Company-specific formulas will be configurable.
Enter values and calculate.
Repeat / Tooling
Press-specific tooling calculation. Exact FA-4 configuration remains configurable.
Prototype only: no tooth pitch or machine limit is hard-coded until the exact press configuration is verified.
Ready.
Colour
Record target LAB, measured LAB, ΔE and ink corrections.
Ready.
Press Settings
Capture the successful setup so repeat jobs start with proven settings.
Waste
Track metres and reasons to expose where margin is being lost.
Setup
620m
Colour matching
310m
Print defect
480m
Other
190m
| Time | Job | Reason | Waste |
|---|---|---|---|
| 09:14 | PM-1048 | Colour matching | 180m |
| 11:32 | PM-1048 | Print defect | 240m |
Fault Finder
Guided troubleshooting based on checks in a logical order.
Ink not drying
Step 1: Are all required lamps/dryers on and operating?
Production History
Compare quoted performance with what actually happened.
| Job | Press | Speed | Waste | Result |
|---|---|---|---|---|
| PM-1038 | FA-4 Classic | 148 m/min | 4.2% | Successful |
| PM-1034 | FA-4 Classic | 135 m/min | 6.1% | Review |